
All datasets and reports
All
|Datasets
|Reports
Packages (9)
ADCP 2007 (A) Data
Data collected by RD Instruments 600kHz ADCP
Start and end date
-
Jul, 2007ADCP 2007 (B) Data
Data collected by RD Instruments 600kHz ADCP
Start and end date
-
Apr, 2008AWAC 2006 Data
Nortek AWAC deployment at EMEC's Bilia Croo wave test site.
Start and end date
-
Jun, 2006AWAC 2012 Data
Data collected by Nortek 600kHz AWAC
Start and end date
-
Nov, 2012Aquadopp 2005 Data
Currents data collected at the EMEC Billia Croo wave test site, 2005. Month info is -3 months: ...
Start and end date
-
Apr, 2005Processing and Quality Control of Currents for BC-SMADC...
Survey BC-SMADCP-02 was undertaken as a follow up to the FUGRO survey (FUGRO, 2001) and referred to ...
Processing and Quality Control of Currents for BC-SMADC...
Currents survey BC-SMADCP-03 was undertaken as a follow-up to the FUGRO survey (FUGRO, 2001) and was...
Processing and Quality Control of Currents for BC-SMADC...
Currents survey BC-SMADCP-04 was undertaken as a follow-up to the FUGRO survey (FUGRO, 2001) and was...
Processing and Quality Control of Currents for BC-SMADC...
Survey BC-SMADP-05 was undertaken as a follow up to the FUGRO survey (FUGRO, 2001). The survey was t...