Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2005, RSKENSR Group, Barrow Offshore Wind Farm, Pre-construction Baseline Environmental Monitoring

2005, RSKENSR Group, Barrow Offshore Wind Farm, Pre-construction Baseline Environmental Monitoring

Top Categories:

Archaeology
Birds
Epifauna and Fish
Geophysical
+ 3 More

Description

This project examines the onshore and offshore elements of the environmental pre-construction monitoring undertaken at the site of the Barrow offshore wind farm to comply with the conditions of the FEPA Act. In some cases repeat surveys will take place to determine the changes following construction or once the wind farm installation is completed. Subsequent annual reports will present results from monitoring surveys during construction and operation, and seek to assess whether any changes seen are a result of wind farm construction or operation.

Report

Download All

2005, RSKENSR Group, Barrow Offshore Wind Farm, Pre-construction Baseline Environmental Monitoring