Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2009-2010, Osiris Projects, Galloper Offshore Wind Farm, Geophysical and Benthic Ecology Survey

2009-2010, Osiris Projects, Galloper Offshore Wind Farm, Geophysical and Benthic Ecology Survey

Top Categories:

Benthic Ecology

Description

Osiris Projects were commissioned in July 2009 by Airtricity Developments (UK) Ltd,
(Airtricity), (since acquired by Scottish and Southern Energy Renewables - SSER) to
undertake an extensive hydrographic, geophysical and benthic environmental survey in the
Outer Thames Estuary, as part of the programme to extend the existing Greater Gabbard
Offshore Wind Farm (GGOWF). This programme will be known as the Galloper Wind Farm
(GWF). The survey was undertaken under Airtricity Contract Reference '09.0558.G' 'Benthic
& Geophysical Survey Services for the Environmental Impact Assessment (EIA)' and was
substantially completed during the period 3r d August to 5t h December 2009, at which point
the GWF survey was postponed due to prolonged periods of severe weather. The surveys
were eventually completed during the period 16t h February to 14t h March 2010.

Dataset

Download All

2009-2010, Centre for Marine and Coastal Studies (CMACS), Galloper Offshore Wind Farm, Geophysical and Benthic Ecology Survey - Grab Samples

Instrument Deployment Logs

Processed Data

Raw Data

Report

Download All

Volume 3 Export Cable Route Corridor

Volume 1 Operations Report

Charts

Volume 2 Areas Report