Summary
DONG Energy Power contracted EGSi to undertake a hydrographic and geophysical survey in the post-construction (operational) phase of the project to determine, changes to seabed morphology and classify targets on the seabed, including exposed cables and rock dumping areas, along the export cable route. he data acquisition took place between Septembe...