Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2014, EGS, Barrow Offshore Wind Farm, Post-Construction Geophysical Survey

2014, EGS, Barrow Offshore Wind Farm, Post-Construction Geophysical Survey

Top Categories:

Geophysical

Description

DONG Energy Power contracted EGSi to undertake a hydrographic and geophysical survey in the post-construction (operational) phase of the project to determine, changes to seabed morphology and classify targets on the seabed, including exposed cables and rock dumping areas, along the export cable route. he data acquisition took place between September-October 2014 on the research vessel, MV Xploer. To meet this objective EGS conducted a multibeam high frequency bathymetric survey combined with seabed mapping and sub-surface hazard identification using side-scan sonar (SSS).

Dataset

Download All

Bathymetry Data

Side-Scan Sonar Data

Report

Download All

Final Charts

Interpretive Report

Appendices