2014, EGS, Barrow Offshore Wind Farm, Post-Construction Geophysical Survey

2014, EGS, Barrow Offshore Wind Farm, Post-Construction Geophysical Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Sep 2014 - Oct 2014

Development:

Barrow

Publication date:

May 2021

Round:

1

Organisation:

EGS

Phase:

Post-construction

Description

DONG Energy Power contracted EGSi to undertake a hydrographic and geophysical survey in
the post-construction (operational) phase of the project to determine, changes to seabed
morphology and classify targets on the seabed, including exposed cables and rock dumping
areas, along the export cable route. he data acquisition took place between September-October 2014 on the 
research vessel, MV Xploer. To meet this objective EGS conducted a multibeam high frequency bathymetric survey combined with seabed mapping and sub-surface hazard
identification using side-scan sonar (SSS).