Summary
Arklow Energy Limited (AEL) commissioned four hydrographic surveys during Spring 2004, Autumn 2004, Spring 2005 and Autumn 2005. The reports feature results of hydrographic surveys around the cable route and turbine foundations. This note summarises the investigations undertaken during the Arklow EIA and bathymetric surveys around the wind turbines...