2015, Fugro EMU Limited, West of Duddon Sands and Barrow Offshore Wind Farm, Bathymetric Surveys

2015, Fugro EMU Limited, West of Duddon Sands and Barrow Offshore Wind Farm, Bathymetric Surveys

Top Categories:

Geophysical

Description

Fugro EMU Limited (Fugro EMU) was commissioned by Dong Energy (the Client) to undertake an asset
inspection survey of Barrow Offshore Windfarm (BOW01) array and inter-array cables. The survey area was
situated in Morecambe Bay, approximately 25 km west of Heysham.
The survey utilised two Fugro owned vessels, Fugro Seeker and Valkyrie and was undertaken between 31
August 2015 and 27 October 2015.

Dataset

Download All

GIS Data

Gridded XYZ Data

SVP Logs

Ungridded XYZ Data

Report

Download All

Interpretive Report

Charts

Operations Report