Greater Gabbard Offshore Wind Farm Met Mast Calibration Project

Greater Gabbard Offshore Wind Farm Met Mast Calibration Project

Topic categories:

Meteorology

Last series update:

December 2021

MEDIN approved

Industry:

Wind

Collection date:

Jan 2005 - Dec 2005

Development:

Greater Gabbard

Publication date:

Dec 2021

Round:

2

Organisation:

Greater Gabbard Offshore Wind Farm Met Mast Calibration Project

Phase:

Pre-construction

Description

Various Calibration certificates prepared by Svend Ole Hansen ApS, Campbell Scientific Limited and GE Druck for the Greater Gabbard Meteorological Mast in 2005. Svend Ole Hansen ApS prepared Certificates for Calibration of Cup Anemometer which were issued on 11th, 12th and 13th July 2005, Campbell Scientific undertook a Temperature Probe Calibratio...