Summary
Adus DeepOcean were contracted by DeepOcean UK1 on behalf of Greater Gabbard Offshore Wind Limited (GGOWL) to undertake the post construction bathymetry of the Greater Gabbard windfarm. The aim of the survey was twofold: firstly to satisfy the consent conditions stipulated within the Marine Licence (number: L/2013/00076/5) issued by the Marine Man...