2010-2012, Fugro Survey Ltd, Greater Gabbard, Interconnector and Inter Array Cable Depth of Burial and Alignment Analysis

2010-2012, Fugro Survey Ltd, Greater Gabbard, Interconnector and Inter Array Cable Depth of Burial and Alignment Analysis

Top Categories:

Geophysical

Description

 Greater Gabbard Offshore Winds Ltd have recently completed the construction of a wind farm approximately
14mi east of Suffolk coast.
The offshore wind farm consists of 152 Wind Turbine Generators (WTGs) with a gross nameplate capacity of
approximately 504MW. The project is now fully operational and the construction was completed in September
2012.
GGOWL signed up CT Offshore to conduct survey of the inter array cables.
This report provides a summary of the export and interconnector cable depth's of burial and alignment.