2010-2012, Fugro Survey Ltd, Greater Gabbard, Interconnector and Inter Array Cable Depth of Burial and Alignment Analysis

2010-2012, Fugro Survey Ltd, Greater Gabbard, Interconnector and Inter Array Cable Depth of Burial and Alignment Analysis

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Apr 2013 - May 2013

Development:

Greater Gabbard

Publication date:

May 2021

Round:

2

Organisation:

Fugro Survey Ltd

Phase:

Post-construction

Description

 Greater Gabbard Offshore Winds Ltd have recently completed the construction of a wind farm approximately
14mi east of Suffolk coast.
The offshore wind farm consists of 152 Wind Turbine Generators (WTGs) with a gross nameplate capacity of
approximately 504MW. The project is now fully operational and the construction was completed in September
2012....