Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2013, HR Wallingford, Greater Gabbard Offshore Wind Farm Limited, Post-Installation Scour Assessment

2013, HR Wallingford, Greater Gabbard Offshore Wind Farm Limited, Post-Installation Scour Assessment

Topic categories:

Metocean

Sedimentology

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Nov 2013 - Jun 2014

Development:

Greater Gabbard

Publication date:

May 2021

Round:

2

Organisation:

HR Wallingford

Phase:

Post-construction

Description

SSE Offshore Wind Generation requested HR Wallingford to perform a scour review based on the 2013 inter-array cable survey data at the Greater Gabbard Offshore Wind Farm (OWF). The survey data was assessed at every turbine location to provide descriptive scour parameters and to provide a baseline description for future asset management.
The Greater...