2001, Titan Environmental Surveys Ltd, Barrow Offshore Wind Farm, Geophysical Survey

2001, Titan Environmental Surveys Ltd, Barrow Offshore Wind Farm, Geophysical Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

November 2001 - December 2001

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Titan Environmental Surveys Limited was commissioned by Warwick Energy Ltd to undertake a geophysical survey for the purpose of assessing the seabed and the shallow sub-seabed conditions prior to the installation of an offshore wind farm approximately 10km South of Barrow-In-Furness in Cumbria. The principal aims of the surveys was to provide compr...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
4
Reports
1