Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2014, ADUS DeepOcean Ltd, Greater Gabbard Offshore Wind Farm, Post Construction Bathymetry Survey Export Cable

2014, ADUS DeepOcean Ltd, Greater Gabbard Offshore Wind Farm, Post Construction Bathymetry Survey Export Cable

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jul 2014 - Aug 2014

Development:

Greater Gabbard

Publication date:

May 2021

Round:

2

Organisation:

ADUS DeepOcean Ltd

Phase:

Post-construction

Description

SSE contracted Adus DeepOcean to perform a multibeam bathymetry survey of a 50 metre zone around export cables L1, L2 and L3 and the IC cable connecting the Galloper and Gabbard Windfarms.