2006-2010, BOWind, Barrow Offshore Wind Farm, Post Construction Monitoring

2006-2010, BOWind, Barrow Offshore Wind Farm, Post Construction Monitoring

Top Categories:

Benthic Ecology
Birds
Epifauna and Fish
Geophysical
+ 3 More

Description

The construction of Barrow Offshore
Wind Farm began in March
2005, and the wind farm became
operational in July 2006. The environmental
post construction monitoring
was initiated on 1 July 2006.

This series details the environmental monitoring undertaken in years 1, 2 and 3 of post-construction from 2006-2010. This should be seen as a continuation of the environmental impact statement, the preconstruction monitoring and the construction monitoring report. Monitoring activities continue post-construction and will be reported annually for three years to teh licensing authority according to the supplementary condition 9.1 of the FEPA licence. The individual survey reports issued by contractors are present as are the report appendices, and the multiple survey data is also provided within this series.

Dataset

Download All

NIRAS Walney Island Bird Survey 2007 Raw Data

WWT Aerial Bird Survey Data

2008-2010 ESSCMACS Boat-based Bird Survey Data

2007 Titan Post-Construction Benthic Survey Data

Report

Download All

Reports, Second Annual Report

Reports, First Annual Report