2005, Osiris Projects, Barrow Offshore Wind Farm, Pre-Construction Geophysical Survey

2005, Osiris Projects, Barrow Offshore Wind Farm, Pre-Construction Geophysical Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

June 2026

Collection date:

March 2005 - April 2005

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

On the instructions of RSKENSR Environment Limited, Osiris Projects were commissioned to carry out a pre-construction survey covering the proposed Barrow Offshore Wind Farm development site and associated cable and navigation routes.  The main development site survey covered an area of approximately 9.8km². High-resolution side scan sonar and singl...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
3

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

XYZ Data

Select a Package from the list on the left to see more information about it