Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2011, Brown and May Marine Ltd., Gunfleet Sands Offshore Wind Farm, Post Construction Fish Survey

2011, Brown and May Marine Ltd., Gunfleet Sands Offshore Wind Farm, Post Construction Fish Survey

Topic categories:

Epifauna and Fish

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Aug 2011 - Aug 2011

Development:

Gunfleet Sands 1 and 2

Publication date:

May 2021

Round:

2

Organisation:

Brown and May Marine Ltd.

Phase:

Post-construction

Description

Brown and May Marine Ltd. was commissioned by DONG Energy to undertake post construction fisheries surveys within the Gunfleet Sands Offshore Wind Farm development. The post construction surveys used the same vessel and gear specifications and survey methodology as the pre-construction surveys, undertaken in 2007