Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2016, Deep BV, Barrow Offshore Wind Farm, Export Cable Geophysical Depth of Burial Survey

2016, Deep BV, Barrow Offshore Wind Farm, Export Cable Geophysical Depth of Burial Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Sep 2016 - Sep 2016

Development:

Barrow

Publication date:

May 2021

Round:

1

Organisation:

Deep BV

Phase:

Post-construction

Description

As part of a transfer of assets between Dong Energy Power UK Ltd (DONG) and TC Barrow OFTO Ltd, a detailed
survey of the Barrow wind farm export cable is required. DONG awarded Deep BV, the Netherlands the
contract to undertake the marine cable inspection survey for three export cables (Barrow, Walney I and
Walney II offshore wind farm export cable...