Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2008, VandS Marine Contracting, Gunfleet Sands 1 Offshore Wind Farm, Offshore Hydrographical And Geophysical Cable Route Survey

2008, VandS Marine Contracting, Gunfleet Sands 1 Offshore Wind Farm, Offshore Hydrographical And Geophysical Cable Route Survey

Top Categories:

Geophysical

Description

This project examines the results of the multibeam echosounder bathymetric survey of the cable export route from the Gunfleet Sands offshore wind farm site. The survey was carried out by DEEP BV on behalf of V+S Marine Contracting. The surveys were conducted between the dates of April 23rd 2008 and May 2nd 2008.

Report

Download All

Offshore Hydrographic and Geophysical Cable Route Survey - Gunfleet Sands 1 Windpark, United Kingdom