Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2002, Hydrosearch Associates Ltd, Gunfleet Sands Offshore Wind Farm, Terrestrial Cable Route Scoping Studyrn

2002, Hydrosearch Associates Ltd, Gunfleet Sands Offshore Wind Farm, Terrestrial Cable Route Scoping Studyrn

Top Categories:

Onshore

Description

This Scoping Report examines factors that are relevant to the terrestrial cable route, at all locations from the intertidal at Holland-on-Sea to the connection with the sub-station. At present, three route options are under consideration. It is considered that each of the three routes may be installed without causing unacceptable impacts, provided that appropriate working methods are used and the work is carried out at the optimum time of year. The purpose of the EIA will be to establish whether this is correct and assess the relative impacts of the three routes so that a planning application can be made on the preferred route.

Report

Download All

2002, Hydrosearch Associates Ltd, Gunfleet Sands Offshore Wind Farm, Terrestrial Cable Route Scoping Study, Final Report