Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2011, PLA Hydrographic Service, Gunfleet Sands 1 and 2, Export Cable and Wind Turbine Inspection Surveys (Spring 2011)

2011, PLA Hydrographic Service, Gunfleet Sands 1 and 2, Export Cable and Wind Turbine Inspection Surveys (Spring 2011)

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Mar 2011 - Mar 2011

Development:

Gunfleet Sands 1 and 2

Publication date:

May 2021

Round:

2

Organisation:

PLA Hydrographic Service

Phase:

Post-construction

Description

The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake repeat Multibeam Echosounder (MBES) and Side Scan Sonar (SSS) surveys at the Gunfleet Sands Offshore Windfarm in the Thames Estuary.   The surveys are required for the FEPA Licence Numbers: Gunfleet Sands 1 31919/09/0 and Gunfleet Sands 2 33723/09/0...