Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2014, Peter Brett Associates, Gunfleet Sands Offshore Wind Farm, Feasibility Study for a Cable Crossing of Holland Brook

2014, Peter Brett Associates, Gunfleet Sands Offshore Wind Farm, Feasibility Study for a Cable Crossing of Holland Brook

Topic categories:

Onshore

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Sep 2005 - Sep 2005

Development:

Gunfleet Sands 1 and 2

Publication date:

May 2021

Round:

2

Organisation:

Peter Brett Associates

Phase:

Pre-construction

Description

Peter Brett Associates were appointed to investigate the most appropriate way in which a 132kv cable crossing could be achieved over/under Holland Brook adjacent to the existing Holland Bridge near the site of Gunfleet Sands Offshore Wind Farm.  Three options are considered viable for providing the Holland Bank cable crossing.  These are a cable ca...