2014, Peter Brett Associates, Gunfleet Sands Offshore Wind Farm, Feasibility Study for a Cable Crossing of Holland Brook

2014, Peter Brett Associates, Gunfleet Sands Offshore Wind Farm, Feasibility Study for a Cable Crossing of Holland Brook

Top Categories:

Onshore

Description

Peter Brett Associates were appointed to investigate the most appropriate way in which a 132kv cable crossing could be achieved over/under Holland Brook adjacent to the existing Holland Bridge near the site of Gunfleet Sands Offshore Wind Farm.  Three options are considered viable for providing the Holland Bank cable crossing.  These are a cable carrying structure over the brook immediately adjacent to the existing bridge, a directionally drilled crossing with the southern approach between Holland Marshes and SSSI and Holland Bridge and a directionally drilled crossing with the southern approach located in Holland Marshes SSI.  Option 1 and 2 are the preferred cable crossing options.  With option 1 favoured over 2.  It is recommended that further investigations of both these options be progressed until such a point a clear winnder emerges.  

Report

Download All

Feasibility Study for a Cable Crossing of Holland Brook at the site of the Gunfleet Sands Offshore Wind Farm