2007, RPS Group, Gunfleet Sands 1 and 2, Environmental Statement

2007, RPS Group, Gunfleet Sands 1 and 2, Environmental Statement

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

January 2025

Collection date:

June 2007 - June 2007

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Environmental Statement for the Gunfleet Sands Offshore Wind Farm project, which is located approximately 7km south-east of Clacton-on- Sea, Essex. The project consists of the already consented Gunfleet Sands 1 project (GS1), which has consent to construct up to 30 turbines and a proposed extension, Gunfleet Sands 2 (GS2).

Categories:
Archaeology
Birds
Epifauna and Fish
Marine Mammals
Shipping and Navigation
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
13