Summary
The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake repeat Multibeam Echosounder (MBES) and Side Scan Sonar (SSS) surveys at the Gunfleet Sands Offshore Windfarm in the Thames Estuary. The previous survey having been undertaken during March 2011 – PLA Reference 113-500-142 Contract Q15/10. The surve...