Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2009, Osiris Projects, Barrow Offshore Wind Farm, Post-Construction Cable Route Inspection and Scour Monitoring Survey

2009, Osiris Projects, Barrow Offshore Wind Farm, Post-Construction Cable Route Inspection and Scour Monitoring Survey

Top Categories:

Geophysical

Description

On the instructions of Barrow Offshore Wind Limited, Osiris Projects were commissioned to undertake an inspection survey covering the Barrow Offshore Wind Farm export cable route, in conjunction with scour monitoring surveys at all of the individual turbine locations within the main development area. Data acquisition took place using the survey vessel MV ‘So Fyne’, during the period 31st March to 3rd April 2009. High-resolution side scan sonar, swath multi-beam and single beam bathymetry data were acquired along a number of parallel survey lines, which were generally run at 25m centres, in order to accurately map the seabed along the cable route.

Dataset

Download All

Turbines XYZ Data

Images

DWG Files

Side Scan Sonar Data

Charts

Cable Route XYZ Data

Report

Download All

Report Figures

Volume 1 and 2 Reports