Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2010, PLA Hydrographic Service, Gunfleet Sands 1 and 2, Export Cable and Wind Turbine Inspection Surveys (Autumn 2010)

2010, PLA Hydrographic Service, Gunfleet Sands 1 and 2, Export Cable and Wind Turbine Inspection Surveys (Autumn 2010)

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Sep 2010 - Sep 2010

Development:

Gunfleet Sands 1 and 2

Publication date:

May 2021

Round:

2

Organisation:

PLA Hydrographic Service

Phase:

Post-construction

Description

The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake Multibeam Echosounder (MBES) and Side Scan Sonar (SSS) surveys at the Gunfleet Sands Offshore Windfarm in the Thames Estuary.

The scope of work included:
1. MBES and SSS survey of 100m wide corridor along Export Cable Route between the windfarm sub...