Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2016, PLA Hydrographic Service, Gunfleet Sands 1 and 2, Sub-Station Asset Integrity Survey

2016, PLA Hydrographic Service, Gunfleet Sands 1 and 2, Sub-Station Asset Integrity Survey

Top Categories:

Geophysical

Description

The purpose of the document in this series is to report upon the acquisition, processing and rendering of
bathymetric survey data in support of the asset integrity multibeam survey undertaken at the
Gunfleet Sands 1 & 2 Windfarm in the Thames Estuary.
The survey data was collected utilising the PLA survey vessel s/v Maplin fitted with a high
resolution R2Sonic 2024 multibeam echosounder operated in a single head configuration. In
order to best utilise favourable tide and weather period’s, acquisition was accomplished on
13th December 2016.
No H&S incidents, near misses or unsafe acts occurred during the project.
The acquired and processed data was of high quality and coverage and sounding density
and associated specifications set by the client were met.
The scope of the GFS 01&02 survey was to survey the Offshore Substation (OSS). 

Dataset

Download All

Bathymetry Data

Report

Download All

Report