Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2015, GoBe Consultants, Gunfleet Sands 1 and 2, Post-Construction Year 3 - Marine Licence Environmental Monitoring Report

2015, GoBe Consultants, Gunfleet Sands 1 and 2, Post-Construction Year 3 - Marine Licence Environmental Monitoring Report

Top Categories:

Benthic Ecology
Birds

Description

This monitoring summary report has been prepared by DONG Energy as part of the Marine Licence monitoring program for the Gunfleet Sands I & II Offshore Wind Farm, under Marine Licences L/2011/00064/9 and L/2011/00065/3 respectively. This report describes the environmental monitoring completed during the third year post construction period running from May 2012 – April 2013, in line with the requirements of the Gunfleet Sands I & II Marine Licences.
Individual technical surveys and studies form the basis for this monitoring summary report. Full copies of the technical reports may be obtained on request.

Report

Download All

2015, GoBe Consultants, Gunfleet Sands 1 and 2, Post-Construction Year 3 - Marine Licence Environmental Monitoring Report