Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2007, Osiris Projects, Gunfleet Sands 1 and 2, Additional Geophysical Surveys

2007, Osiris Projects, Gunfleet Sands 1 and 2, Additional Geophysical Surveys

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jan 2007 - Dec 2007

Development:

Gunfleet Sands 1 and 2

Publication date:

May 2021

Round:

2

Organisation:

Osiris Projects

Phase:

Pre-construction

Description

On the instructions of Dong Energy, Osiris Projects were commissioned to carry out additional survey and sampling works across the Gunfleet 1 and Gunfleet II offshore wind farm sites in the outer Thames estuary, in order to supplement existing data sets collected during previous surveys carried out during 2001 and 2005. Supplemental bathymetric sur...