Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2013, PLA Hydrographic Service, Gunfleet Sands 3, HDD Exit Point - Inspection Survey

2013, PLA Hydrographic Service, Gunfleet Sands 3, HDD Exit Point - Inspection Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Apr 2013 - Apr 2013

Development:

Gunfleet Sands 3

Publication date:

May 2021

Round:

Demo

Organisation:

PLA Hydrographic Service

Phase:

Post-construction

Description

The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG
Energy to undertake a survey of the installed HDD exit point, including the as-laid
protective mattresses, at the Gunfleet Sands 3 Windfarm in the Thames Estuary.

The scope of work, for the April 2013 survey was for a MBES survey of an area of the
seabed centred on th...