Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2012, DONG Energy, Gunfleet Sands 3 - Demonstration Project, Decommissioning Plan

2012, DONG Energy, Gunfleet Sands 3 - Demonstration Project, Decommissioning Plan

Topic categories:

Engineering Design

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Mar 2012 - Jul 2012

Development:

Gunfleet Sands 3

Publication date:

May 2021

Round:

Demo

Organisation:

DONG Energy

Phase:

Post-construction

Description

In August 2010, DONG Energy was awarded a demonstration lease by The Crown Estate for a site to the south west of the GFS 2 array to construct two demonstration turbines with a maximum installed capacity of 20 MW together with associated inter-connecting cabling. This is known as the Gunfleet Sands 3 Demonstration Project (GFS 3).
     Applicable r...