Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2012, EGS (International) Ltd., Gunfleet Sands 3, UXO Clearance Survey

2012, EGS (International) Ltd., Gunfleet Sands 3, UXO Clearance Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

May 2012 - May 2012

Development:

Gunfleet Sands 3

Publication date:

May 2021

Round:

Demo

Organisation:

EGS (International) Ltd.

Phase:

Pre-construction

Description

DONG Energy Renewables requested the PLA to provide geophysical and hydrographic survey works
along 9km of the Phase 3 Gunfleet Sands Demo Offshore Windfarm Site (OWF) proposed cable
export route and proposed turbine sites for UXO clearance purposes.

The PLA conducted the hydrographic (Multi Beam Echo Sounder (MBES)) element of the survey over
the...