Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2013, PLA Hydrographic Service, Gunfleet Sands 3, Export Cable and WTG Inspection Surveys (Autumn 2013)

2013, PLA Hydrographic Service, Gunfleet Sands 3, Export Cable and WTG Inspection Surveys (Autumn 2013)

Topic categories:

Geophysical

Sedimentology

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Oct 2013 - Oct 2013

Development:

Gunfleet Sands 3

Publication date:

May 2021

Round:

Demo

Organisation:

PLA Hydrographic Service

Phase:

Post-construction

Description

The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake a Multibeam Echosounder (MBES) survey at the Gunfleet Sands 3 Offshore Windfarm in the Thames Estuary.
The scope of work, for the October 2013 survey included:

1. MBES survey of 50m wide corridor along Export Cable Route between the WTG F0 and the ...