Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2011 Zone 4 Hornsea, EMU Intertidal Ecology Field Survey

2011 Zone 4 Hornsea, EMU Intertidal Ecology Field Survey

Top Categories:

Intertidal Ecology

Description

Hornsea Project Two is a second development in the Hornsea Zone in the North Sea off the east coast of the UK. The development has the potential to comprise of several wind farm arrays in the centre of the Hornsea Zone, adjacent to Project One.

The benthic characterisation survey of the Project Two Study area was conducted over seven days in July 2012. The results of this survey will inform the Environmental Impact Assessment (EIA) process, in support of the planning (and consent) application for development of Project Two.

The benthic ecology survey, including seabed video, sediment and contaminants sampling and epibenthic trawls was undertaken to acquire data to provide a robust benthic characterisation of the Project Two area.

Dataset

Download All

2011, EMU, Zone 4 - Hornsea, Intertidal Ecology Field Survey_RawData

Report

Download All

2011, EMU, Zone 4 - Hornsea, Intertidal Ecology Technical Survey Report

2011, Zone 4 - Hornsea, Cable Route, Intertidal Ecology Survey Specifications, Scope Report