2008, Osiris Projects, Humber Gateway, Export Cable Route Geophysical Survey

2008, Osiris Projects, Humber Gateway, Export Cable Route Geophysical Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

August 2008 - October 2008

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Osiris Projects were commissioned by E.ON Climate & Renewables UK to carry out a
detailed hydrographic and geophysical survey for the Humber Gateway ‘Round Two’
offshore wind farm development area and its associated export cable routes.
Survey data were acquired across the footprint of the main development site and the
two, 1km-wide export cabl...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'