2015, Bibby HydroMap, Humber Gateway Offshore Wind Farm, Rock Bag Post Installation Survey

2015, Bibby HydroMap, Humber Gateway Offshore Wind Farm, Rock Bag Post Installation Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Oct 2015 - Oct 2015

Development:

Humber Gateway

Publication date:

May 2021

Round:

2

Organisation:

Bibby HydroMap

Phase:

Post-construction

Description

Bibby HydroMap were commissioned in October 2015 by E.ON to carry out rock bag post installation survey using a high resolution multibeam system at the Humber Gateway Offshore Wind Farm. The survey was carried out between 3rd October 2015 and 6th October 2015. The main objective of the survey was the accurate positioning and high resolution images of all deployed rock bags.