Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2015, Animal and Plant Health Agency (APHA), Humber Gateway Offshore Wind Farm, Post-Construction Pink-footed Goose Radar Survey

2015, Animal and Plant Health Agency (APHA), Humber Gateway Offshore Wind Farm, Post-Construction Pink-footed Goose Radar Survey

Top Categories:

Birds

Description

The Animal and Plant Health Agency (APHA) was commissioned by the Institute of Estuarine and Coastal Studies, on behalf of E.ON Humber Gateway Limited, to monitor the 2015 autumn passage and flight activity associated with migrating Pink-footed geese through the Humber Gateway Wind Farm and to compare this data with pre-construction data from a comparable 2012 study.
Continuous radar surveys to cover the autumn migration period were carried out between 14 September and 20 November 2015 (68 days). The surveys were combined with visual observations undertaken by radar ornithologists for 7 hours each day, during daylight hours, providing a total of 476 observational hours.

Dataset

Download All

Data

Report

Download All

Report

Metadata Files