Summary
Post construction survey 2015 for Humber Gateway Offshore Wind Farm conducted by Harkand Andrews Survey between 17 March - 28 May 2015. The extent of the areas covered by the post construction site survey are as follows: - Array Cables: the array cables were surveyed in 15m wide corridors, using the array cable as the centre line. - Export Cable Ro...