Summary
Osiris Projects were commissioned in December 2011 by EON to carry out an extension to the UXO survey at the proposed Humber Gateway windfarm, which was completed in June 2011. The site initially consisted of seventy four 120m x 120m boxes, which was extended to 300m x 300m boxes for this contract, around the proposed turbine and substation locatio...