Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2018, Natural Power Consultants Ltd., Blyth NaREC Offshore Demonstration Site, Post-Construction Benthic Monitoring - Array 2

2018, Natural Power Consultants Ltd., Blyth NaREC Offshore Demonstration Site, Post-Construction Benthic Monitoring - Array 2

Topic categories:

Benthic Ecology

Last series update:

November 2021

MEDIN approved

Industry:

Wind

Collection date:

May 2018 - Sep 2018

Development:

Blyth Demonstration Site

Publication date:

Nov 2021

Round:

Demo

Organisation:

Natural Power Consultants Ltd.

Phase:

Post-construction

Description

Annex 2 of the Marine Licence (L/2013/00303) specified that a post-construction monitoring programme including benthic ecology surveys must be undertaken, which must also include a survey for Annex 1 habitats. Post-construction surveys are required to assess any changes in the diversity and distribution of benthic ecology populations in and around ...