Summary
The Inner Dowsing Offshore Wind Farm (OWF) was constructed in 2007/08 by Centrica Renewable Energy Limited and comprises 27 x 3.6MW wind turbines installed on monopole foundations. Turbines are connected by inter-array cables and export cables transmit power from the site to a landfall near Skegness, Lincolnshire. Due to mechanical issues, a gear-...