Summary
The Pre-Construction Baseline Monitoring Report read in conjunction with the attached survey reports, constitutes the Pre-Construction Baseline Monitoring Report for Array 2, as required under Condition 5.2.14 of the Marine Licence. It presents the findings of the pre-construction Annex I habitats; benthic ecology; fish & shellfish; ornith...