Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2005, EMU Ltd., Kentish Flats Offshore Wind Farm, Post-Construction Bathymetric Swath Survey 2(20112005)

2005, EMU Ltd., Kentish Flats Offshore Wind Farm, Post-Construction Bathymetric Swath Survey 2(20112005)

Topic categories:

Coastal Processes

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Nov 2005 - Nov 2005

Development:

Kentish Flats

Publication date:

May 2021

Round:

1

Organisation:

EMU Ltd.

Phase:

Pre-construction

Description

In accordance with the FEPA licence, there is a requirement to undertake pre-construction and post-construction bathymetric surveys of a selection of turbine locations and the associated cable corridor to determine rates of scour around the turbines after construction. Emu Limited was commissioned by NEG Micon UK Ltd. to perform a series of hydrogr...