2005, EMU Ltd., Kentish Flats Offshore Wind Farm, Post-Construction Bathymetric Swath Survey 2(20112005)

2005, EMU Ltd., Kentish Flats Offshore Wind Farm, Post-Construction Bathymetric Swath Survey 2(20112005)

Top Categories:

Coastal Processes
Geophysical

Description

In accordance with the FEPA licence, there is a requirement to undertake pre-construction and post-construction bathymetric surveys of a selection of turbine locations and the associated cable corridor to determine rates of scour around the turbines after construction. Emu Limited was commissioned by NEG Micon UK Ltd. to perform a series of hydrographic surveys of these areas in order to determine whether any souring occurs around the turbines or significant changes to the seabed profile have been made during construction of the windfarm. This project relates to the second post-construction swath survey which was carried out on 20th November 2005 from the vessel Emu surveyor.

Report

Download All

Report