Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2005, EMU Ltd., Kentish Flats Offshore Wind Farm, Post-Construction Bathymetric Swath Survey (16012005)

2005, EMU Ltd., Kentish Flats Offshore Wind Farm, Post-Construction Bathymetric Swath Survey (16012005)

Top Categories:

Coastal Processes
Geophysical

Description

In accordance with the FEPA licence, there is a requirement to undertake pre-construction and post-construction bathymetric surveys of a selection of turbine locations and the associated cable corridor
to determine rates of scour around the turbines after construction. Emu Limited was commissioned by
NEG Micon UK Ltd. to perform a series of hydrographic surveys of these areas in order to determine
whether any scouring occurs around the turbines or significant changes to the seabed profile have been
made during construction of the wind farm. This project relates to the first post-construction swath survey which was carried out on 16th January 2005 from the vessel Avante. 

Dataset

Download All

Swath Bathymetry Track Data

Report

Download All

Report

Bathymetric Plot Drawings