Summary
In accordance with the FEPA licence, there is a requirement to undertake pre-construction and post-construction surveys of the Kentish Flats wind farm site to determine whether any debris has been left on the seabed or significant changes to the seabed profile have occurred as a result of the construction activity. EMU Limited was commissioned by N...