2007, EMU Ltd., Kentish Flats Offshore Wind Farm, Post-Construction Bathymetric Swath Survey 6

2007, EMU Ltd., Kentish Flats Offshore Wind Farm, Post-Construction Bathymetric Swath Survey 6

Topic categories:

Coastal Processes

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Nov 2007 - Nov 2007

Development:

Kentish Flats

Publication date:

May 2021

Round:

1

Organisation:

EMU Ltd.

Phase:

Pre-construction

Description

In accordance with the FEPA licence, there is a requirement to undertake pre-construction and post-construction surveys of a selection of turbine locations and the associated cable corridors to determine rates of scour after construction. Emu Limited was commissioned by Kentish Flats Ltd. to carry out a series of hydrographic surveys spaced at 6 monthly intervals both before and after construction to achieve this requirement.
This project relates to the seventh such survey, the sixth since construction of the turbine foundations. The fieldwork was performed between 2nd and 5th November 2007 by our subcontractor Port of London Authority (PLA) using the survey vessel Verifier. Depth data were acquired by a multibeam system fully integrated with motion sensor and navigation software.