Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2004, EMU Ltd., Kentish Flats Offshore Wind Farm, Intertidal Cable Lying Monitoring Survey

2004, EMU Ltd., Kentish Flats Offshore Wind Farm, Intertidal Cable Lying Monitoring Survey

Topic categories:

Benthic Ecology

Intertidal Ecology

Sedimentology

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Sep 2004 - Sep 2004

Development:

Kentish Flats

Publication date:

May 2021

Round:

1

Organisation:

EMU Ltd.

Phase:

Pre-construction

Description

A survey of the intertidal zone of the proposed Kentish Flats Wind Farm cable landfall area was undertaken by Emu Ltd on behalf of Kentish Flats. The survey is part of the specifications for the site environmental management plan through the pre-construction phase as outlined by FEPA licence conditions. The aim of the study was to establish an ecol...