2007, CT Offshore, Kentish Flats Offshore Wind Farm, Post Lay Inspection Of 33 kV HVAC Cable At Kentish Flats Wind Farm

2007, CT Offshore, Kentish Flats Offshore Wind Farm, Post Lay Inspection Of 33 kV HVAC Cable At Kentish Flats Wind Farm

Topic categories:

Sedimentology

Last series update:

August 2022

Download MEDIN file

Industry:

Wind

Collection date:

Jul 2007 - Aug 2007

Development:

Kentish Flats

Publication date:

Aug 2022

Round:

1

Organisation:

CT Offshore

Phase:

Post-construction

Description

CT Offshore was awarded the maintenance survey contract requiring Post Installation Maintenance Survey of the 33 kV power cable between the offshore WTG foundations and the land fall cables running ashore.

It was agreed to commence the survey at the identified critical sections – and evaluate along the operation taking the weather and progress in ...