Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2008, Emu Ltd, Kentish Flats Offshore Windfarm, Post-Construction Swath Survey

2008, Emu Ltd, Kentish Flats Offshore Windfarm, Post-Construction Swath Survey

Topic categories:

Geophysical

Last series update:

August 2022

Download MEDIN file

Industry:

Wind

Collection date:

Nov 2007 - Nov 2007

Development:

Kentish Flats

Publication date:

Aug 2022

Round:

1

Organisation:

Emu Ltd

Phase:

Post-construction

Description

In accordance with the FEPA licence, there is a requirement to undertake pre-construction and postconstruction surveys of a selection of turbine locations and the associated cable corridors to determine rates of scour after construction. Emu Limited was commissioned by Kentish Flats Ltd. to carry out a series of hydrographic surveys spaced at 6 mon...