Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2004, EMU Ltd., Kentish Flats Offshore Windfarm, Pre-Construction Debris Surveyrn

2004, EMU Ltd., Kentish Flats Offshore Windfarm, Pre-Construction Debris Surveyrn

Topic categories:

Geophysical

Last series update:

August 2022

Download MEDIN file

Industry:

Wind

Collection date:

Aug 2004 - Aug 2004

Development:

Kentish Flats

Publication date:

Aug 2022

Round:

1

Organisation:

EMU Ltd.

Phase:

Pre-construction

Description

In accordance with the FEPA licence, there is a requirement to undertake pre-construction and postconstruction surveys of the Kentish Flats windfarm site to determine whether any debris has been left
on the seabed or significant changes to the seabed profile have occurred as a result of the construction
activity. Emu Limited was commissioned by NEG...