Summary
A post construction survey was carried out by EMU Ld between 23 September and 8 October 2005. A single beam echo sounder and sidescan sonar collected data which was compared with the pre construction survey data. Analysis of this data by EMU suggested that 10 of the 52 targets identified were possible debris. The aim of Quest Underwater Services L...