2006, RPS, Lincs Offshore Wind Farm, Flood Risk Assessment

2006, RPS, Lincs Offshore Wind Farm, Flood Risk Assessment

Topic categories:

Onshore

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Aug 2006 - Aug 2006

Development:

Lincs

Publication date:

May 2021

Round:

2

Organisation:

RPS

Phase:

Pre-construction

Description

RPS Planning Transport and Environment (RPS) were commissioned to undertake a
Flood Risk Assessment (FRA) for the laying of electrical cables from three offshore wind farms
to an existing electrical substation at Walpole. Centrica Renewable Energy Limited
(CREL) will need to extend the substation at Walpole. National Grid (NG) will also be required...